Booral Road and Boundary Road (Urangan), intersection upgrade
Detailed design is underway for a proposed upgrade of the Booral Road and Boundary Road intersection...
Detailed design is underway for a proposed upgrade of the Booral Road and Boundary Road intersection...
Proserpine – Shute Harbour Road will benefit from a $21 million flood immunity upgrade at Hamilton Plains between the Bruce Highway turn-off and Strathdickie Road...
The Queensland Government is finalising planning for the duplication of Caboolture-Bribie Island Road between Old Toorbul Point Road and Saint Road, including signalisation of the Volz Road...
Coomera Connector (Stage 1) is around 16km and will be delivered in 3 construction packages. Stage 1 South, currently in the design phase, is the section from Smith Street Motorway to Nerang-...
The design project is investigating safety improvements for a four-kilometre section of the Cunningham Highway between Tregony and Maryvale...
The Department of Transport and Main Roads is undertaking detailed design for an upgrade of the Maryborough-Hervey Bay Road and Pialba-Burrum Heads Road intersection in Eli Waters...
This project aims to improve the flood immunity and reduce flood closure times at the Pialba–Burrum Heads Road crossing...
We are undertaking planning for the Linkfield Road Interchange Upgrade in Bald Hills...
New signalised intersection upgrade on Steve Irwin Way at Caloundra Street, Landsborough...
Coomera Connector (Stage 1) is around 16km long and will be delivered in 3 construction packages. Stage 1 Central, which is currently in the design phase, is the 8km section from Helensvale Road to...